Sale!

QUMY Leather Dog Leash 6ft, Heavy Duty Dog Training Leash for Large and Medium Dogs, Soft and Strong Genuine Leather Braided Handmade Long Lead Le…-Fast Shipping

Original price was: $23.68.Current price is: $7.10.

SKU: 8782776533219 Category:

Description

QUMY Leather Dog Leash 6ft, Heavy Duty Dog Training Leash for Large and Medium Dogs, Soft and Strong Genuine Leather Braided Handmade Long Lead Leash for Dog Training, Brown
Braided Leather Dog Leash: Made of soft and durable 100% premium top layer cowhide leather which is made of a single piece of leather, can provide your dog with maximum comforts. The professional strong dog leash has two-part twisted knot braided by handwork which can greatly relieve the impact of the dog when sprinting, looks fashionable and beautiful.
Soft Handle and Pure Copper Hook: The heavy-duty dog leash is made of full solid brass swivel hook with strong tensile resistance. 360 rotation sturdy hook will prevent your dog lead leash from twisting, and can be easily tied to a dog collar or chest strap. The super soft handle can prevent the burning hands feeling when the dog pulls hard. Experience peace of mind and safety during every walk with your dogs.
Perfect Size: 6 foot ×3/4 inch. The 6ft braided leather dog leash is idea for dog training, daily walking, running, travel and outdoor. The long lead leath can help you to effectively restrain your dog’s behavior when walking on the street or in the yard. This tactical dog leash is also the perfect length for training process period.
Professional Training Dog Leash: Highly recommend by many professional dog trainers and owners. Suitable for large and medium dogs, such as German Shepherd, Border Collie, Golden Retriever, Bichon Frize, Mastiff, Bernese Mountain Dog, Great Dane, Saint Bernard, Australian Shepherd, Rottweiler, Bulldog, Pug, Labrador Dogs, Beagle etc.
Good Quality and Service: The leather dog leash is long-lasting and need only an easy cleaning with soft damp cloth and air dry. Please rest assured to use, if the harness is inappropriate or have other problems when you received it, please contact us in time and we will provide you with service.

rrr

    r

  • FREE standard shipping within the United States(3-6 Days)on all orders!
  • r

  • 100% money back guarantee for items not delivered or damaged during shipping.
  • r

  • Safe and secure checkout with our high quality encryption
  • r

  • Shipping services: UPS, FedEx, USPS.
  • r

  • Only ship to the lower 48 states, no APO/FPO addresses or PO Boxes allowed.
  • r

  • Local pickups and combined shipping options are not provided at this time.
  • r

rrr

rrrrrr

    r

  • You can return a product for up to 30 days from the date you purchased it.
  • r

  • Any product you return must be in the same condition you received it and in the original packaging. Please keep the receipt.
  • r

  • A full refund if you don’t receive your order
  • rA full refund if your order does not arrive within the guaranteed time (6-7 business days not including 1 processing day.)r

rrr
rrrrrr

We accept payment by any of the following methods:

Credit Cards, PayPal, Shop Pay, Apple Pay, Google Pay, Amazon Pay, Meta Pay

rrrrrr

Customer satisfaction is very important to us.
If you have any problem with your order, please contact us and we will do our best to make you satisfied.

rrr
rrrrr
r

If you have any queries, please contact us via

r

Support

r

We usually respond within 24 hours on weekdays.

rr
rrrr

Reviews

There are no reviews yet.

Be the first to review “QUMY Leather Dog Leash 6ft, Heavy Duty Dog Training Leash for Large and Medium Dogs, Soft and Strong Genuine Leather Braided Handmade Long Lead Le…-Fast Shipping”

Your email address will not be published. Required fields are marked *