Sale!

Therapists Choice Premium Extra Long 6 Foot (72inchs Long) Lead Wires for TENS and EMS Units Standard Female Plug (2)-Fast Shipping

Original price was: $29.94.Current price is: $8.98.

SKU: 69554024 Category:

Description

Extra Long, Standard shielded plastic female right angle plug, 72 inch wires

Pair of 2 extra long leads to connect a total of 4 electrodes

Pins fit standard 2mm pigtail electrode pad connectors

Compatible with most standard TENS & EMS units. NOT compatible with Empi or Prospera or SUPPENDON devices

Extra Long Length allows the user to have more freedom and distance from their device for more comfort. These are 72 inches long, most are only 42 inches long.

Reviews

There are no reviews yet.

Be the first to review “Therapists Choice Premium Extra Long 6 Foot (72inchs Long) Lead Wires for TENS and EMS Units Standard Female Plug (2)-Fast Shipping”

Your email address will not be published. Required fields are marked *